Baggage Handling Heating & Chilled Installation

An extension to the existing baggage handling facilty, the contract was to hang 10 pipes of heating and chilled mains pipework with branches to feed a mixture of ceiling mounted fan coil units, floor fan coil units and radiators. After testing the new circuits were then tied into the airports existing heating and chilled water pipework. All pipework was fitted in screwed steel sizes from 1/2" up to 2"